TPS22918 load switch: 1 to 5.5 V, 2 A, 52 mΩ

A single-channel load switch with controlled rise time and quick output discharge for switching sensor and module rails: on-resistance, current and pins.

By Jignesh Panchal · Sources, testing and AI policy

  • TypePower
  • LevelBeginner
  • ReviewedNov 2026

The TPS22918 is a single-channel load switch with an N-channel MOSFET that passes up to 2 A continuous from a 1 V to 5.5 V input, with 52 mΩ typical on-resistance at 5 V and a rise time you set with a capacitor. It lets a microcontroller power a sensor or module on and off from a GPIO. Figures are from the Texas Instruments TPS22918 datasheet SLVSD76C.

Key specifications

Input1–5.5 V
Current2 A continuous
RON52 mΩ at 5 V, 53 mΩ at 3.3 V
IQ8.3 µA typical (3.3 V)
Rise timeset by CT pin
PackageSOT-23-6

What the datasheet promises

ItemDatasheet value
Input voltage1 V to 5.5 V
Continuous current2 A maximum
On-resistance52 mΩ typical at VIN = 5 V; 53 mΩ at 3.3 V
Quiescent current8.3 µA typical at VIN = 3.3 V
ControlOn/off input that works with GPIO signals of 1 V or higher
Rise timeConfigurable with a capacitor on the CT pin, to limit inrush current
Quick output dischargeAdjustable
TemperatureAmbient −40 to 105 °C
PackageSOT-23-6 (DBV)

A load switch is not a regulator: it passes the input voltage through, with a small drop, and the slow rise protects the supply from the surge of charging a large capacitor on the switched rail.

Using it on a robot

  • Cut power to a sensor, camera or radio module between readings to save battery, as the TPS7A02 page does for the regulator.
  • Choose the CT capacitor so the rail rises slowly enough to avoid a supply droop.
  • Keep the switch within the 2 A limit, including start-up surges.

Sources and further reading

Last reviewed: November 2026. Limits are from the Texas Instruments datasheet; breakout boards and modules vary. No price is quoted because it has not been checked.

Where to buy in India

These open a store search. Compare seller, price and reviews before you order.

Free: the final-year project pack

A shortlist with BOMs, a report outline that matches the usual chapter scheme, a costing sheet and 40 viva questions. Built for the February–April submission season.

The Build Note

One short email when something is worth your bench time.

A new build sheet, a part price that moved, or a mistake worth avoiding. No daily drip, no recycled news.

One short email when a build or a price is worth your time. Unsubscribe in one click.